Confidential Client Civil and Structural Design and Inspection Services

Sustainable Infrastructure

Location: Co. Cork, Ireland
Client: Confidential Client
Status: Complete
Overall Project Value: N/A

Brief Description

A Confidential Client which specialises in the development, testing and manufacturing of biologics and biopharmaceuticals.

 

View More Close

FT Responsibilities

FT have carried out a number of projects at this facility to ensure compliance with the company’s IPPC licence;

  • 7-day Hydrostatic testing of concrete bunds and 24-hr hydrostatic testing of mobile metal and plastic bunds in accordance with the BS 8007 “Design of concrete structures for retaining aqueous liquids”. This testing is required by the EPA every 3 years and all the bunds at this facility are divided into 3 groups of bunds with 1 group requiring testing every year. FT produced testing certificates and a report outlining the test procedure and the results.
  • Bund capacity review of all bunds on site to ensure that the volumes of tanks stored in the bunds are in accordance with EPA regulations.
  • Calculation of the depths at which rainwater should be emptied from each external bund to avoid overtopping of the bunds should a tank failure occur.
  • Decommissioning plan for an underground tank following the diversion of services from an unused section of the site.
  • Carried out inspections and created a repair strategy report for several damaged concrete bunds.
  • Visual inspection and certification of surface water lagoon.
  • Advise on the installation of automatic pumps at sumps and the construction of new access chambers to allow access for the weekly inspections.
  • Visual condition report based on a drone survey, of concrete tanks. The drone survey was required as the tanks are a confined space and no entry was allowed. This drone survey was carried out under FT supervision and direction.
  • Final effluent line inspection and condition report
  • Oil interceptor condition surveys and design of a new double oil interceptor on the storm water line

 

Project Statistics

Statistic Icon

3

Bunds must be tested every 3 years

Statistic Icon

24

24-hr hydrostatic testing of mobile metal and plastic bunds was conducted

Statistic Icon

7

7-day Hydrostatic testing of concrete bunds was conducted

Available positionsCareers

Position Sector Location
Project Engineer Highways Active Travel Sustainable Infrastructure Cork, Dublin or Carlow
Senior Project Engineer Highways Active Travel Sustainable Infrastructure Cork, Dublin or Carlow
Associate Director – Highways and Active Travel Sustainable Infrastructure Cork, Dublin or Carlow
Principal Structural Design Engineer Sustainable Infrastructure Cork, Dublin or Carlow
Principal Project Manager – Highways Sustainable Infrastructure Cork, Dublin or Carlow