Historic Landfill Remediation Project
Circular Economy
Brief Description
Fehily Timoney and Company (FT) provide a range of services with respect to risk assessments of Historic Landfills sites in accordance with the EPA Code of Practice: Environmental Risk Assessment for Unregulated Waste Disposal Sites. FT offers a total project management solution, acting as consultants from initial project planning and Tier 1 assessment through to detailed remediation design, construction supervision and contract supervision.
FT’s Technical Director, Mr. Chris Cronin, and Waste and Resources Group Principal Engineer, Mr. James O’ Neill, are accredited with Engineers Ireland as competent/qualified in relation to the Code of Practice: Environmental Risk Assessment for Unregulated Waste Disposal Sites.
Experience
FT have undertaken Tier 1, 2 and 3 assessments, detailed remediation design and remediation procurement, supervision and contract administration services across the following counties to date:
Fingal, Kerry, Kilkenny, Kildare, Longford, Meath, Monaghan, Mayo, South Dublin, Tipperary, Wicklow
FT Responsibilities
- Tier 1,2 & 3 Environmental Risk Assessment in line with EPA Code of Practice
- Generic Quantitative and Detailed Quantitative Risk Assessments – LandGEM, LandSIM, GasSIM, ModFLOW etc.
- Site investigations: Design, Specification, Procurement, Supervision and Reporting including;
- Site Walkover and Manual Sampling
- Trial Pitting (Excavation, Logging, Percolation Testing)
- Borehole Installation (Cable Percussive, Rotary Core, In situ Testing)
- Geophysical Survey (Ground Penetration Radar, Electro Magnetic, Electro Resistivity, Sonic)
- Topographical Surveying (Contour Mapping, Volumetric Assessment (AutoCAD Civil 3D)
- Environmental Monitoring and Reporting (Surface water, groundwater, landfill gas, VOC Emissions, PM10)
- Remediation Design and Detailed Cost Estimates
- Certificate of Authorisation Applications
- S177AE Applications
- CPO Applications Unregistered Lands
- Procurement Services: Remediation Works
- Resident Engineering Services
- Public Works Contract Administration Services (Employers Representative)
Project Statistics
15
Counties where FT have undertaken Tier 1, 2 and 3 assessments, detailed remediation design and remediation procurement, supervision and contract administration services to date
50+
Preparation of Tier 2/3 assessments reports and the deign of remedial measures for Local Authority Historic Landfills
3
Fully Remediated Sites